There are many things to be considered while deciding for new building constructing, you may easily miss-out some small details, which may create some confusions and even complication during construction. If you do enough workout prior to the construction you can avoid many situations which creates havoc during construction, which leads to accomplish your construction with ease as per your plan within the specified timeframe and budget. Here are some key points you should follow in sequential order before commencing any construction;
1. Be Sure About your Requirements Before Building Constructing
The very first thing is to establish an idea about what exactly you want to build, which must caters your requirements. Most of the time peoples get carried away by the constructions around them which may be irrelevant to their requirements. You have to decide the size and nature of your house as per your requirements.
2. Assess your Budget For Building Constructing
While establishing your requirements you should have tentative calculations about your budget constraint. Most of the time the requirements area guided by the available budget.
3. Selection of Designer
You must have a designer (Engineer/Architect) to print your idea into a paper. While selecting a designer you should focus on whether or not the designer have the similar kind of expertise that you are looking for. Designer should design the building as per your requirements within your budget.
4. Legislative procedure
All design, drawings and necessary documents must be prepared according to the guidelines provided by the local authorities. Design must be approve and registered by local authorities before starting of construction.
5. Selection of Materials For Building Constructing
After the completion of the design you should select the construction material. While selecting any material, you should know the availability of the material and the manpower required in the local market. After finalizing the material, the designer should prepare the material specification and cost estimate of the construction.
6. Selection of Contractor
Selecting a contractor only on the basis of cost may cause you more problems during construction. You should consider the quality of the past work and reputation of the contractor along with the cost. Contract document must contain the rate of works, rate of material, construction methodology, rate of labor, construction schedule and responsibilities of each parties involved.
7. Supervision during Construction
Provision of supervision should be create during construction to maintain the quality work. If any works are not according to the prior agreement they should be rectified as soon as possible.
8. Changes
If there is any changes in the original plan it causes the change in cost. The change in cost should be analyzed and agreed before any further progress is made.
9. Final Check before handover
After completion of the construction you should check whether each components are working properly or not. Special care should be provide to the electrical, water supply, sanitary connection and fittings. If any faults found they should be rectified before handover.